From the design of the pile foundation, the geotechnical engineer is expected to hand about the soil investigation report back to the structural engineer, who'll progress to deliver the longitudinal reinforcements required for your piles and likewise design the pile cap. Happy with SIMEX Bangladesh’s asphalt batching plant device. https://jenningsx753qyh1.rimmablog.com/profile