As seen in the determine beneath, ongoing auger is utilized to drill the borehole, raise up drilled soil, and pour concrete when the auger is moved up. Because of this, the borehole will not have to have casing or hydrostatic tension to prevent damage to the borehole wall. Hook up https://castinsitupiles33084.blogsidea.com/38853373/detailed-notes-on-cast-in-situ-piles