The plans also contain an enormous battery at the positioning, to make certain excess energy may be saved with the night, as well as a 220 kV transmission line which can link the undertaking towards the North Star sub-station, in the vicinity of where by a different one hundred MW https://citypointsolar.com.au/10kw-solar-system/