1

Advanced 400 kW Chiller Installation Secures £50K Yearly Energy Savings and 200 Metric Tonnes CO₂ Cut

News Discuss 
Installation Overview Newsome has efficiently finalised the installation and commissioning of a new 400 kW chiller at a well-known confectionery manufacturing site in York. This initiative supports a substantial step forward in the client’s ESG framework, enhancing operational resilience and achieving measurable reductions in both energy consumption and carbon output. https://onelifesocial.com/story6133243/advanced-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story